Home > Buy Now > Steel Pipes > Astm A519 Seamless Carbon and Alloy Steel Mechanical Tubing
 


Jiangsu Huacheng Industry Pipe Making Corporation
 
icon Boiler Tubes,Heat Exchanger Tube and Superheater Tube
icon API Spec 5L 5CT Ling Pipe, Casing and Tubing
icon Seamless Carbon and Alloy Steel Mechanical Tubing
icon Steel Tube for Pressure Service

line

icon Company Profile
icon Selling Leads

line


icon To Chinese Page


 
Contact us
Jiangsu Huacheng Industry Pipe Making Corporation
[China]
Address:
337 East People Road, Tangqiao Town Suzhou Jiangsu 215611 China
Phone:
86-138-12877559
Contact name:
Terry Khu , Chief Bus-Executive Officer
Inquire now










Jiangsu Huacheng Industry Pipe Making Corporation



 
Seamless Carbon and Alloy Steel Mechanical Tubing

Astm A519 Seamless Carbon and Alloy Steel Mechanical Tubing

Inquire now

Astm A519 Seamless Carbon and Alloy Steel Mechanical Tubing

Click to enlarge image

 Origin China
 Model Number HC2009022305

Executive Tube Standard :   ASTM A519 - Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing


Product particular communication:

1) Size: 6.35 - 114.3mm (OD) x 0.89 - 15mm (WT) ;

2) Tight tolerance, Smooth surface, Uniform mechanical property(Mechanical Properties equilibrium) ;

3) Heat treatment: BK, BKS, GBK, NBK,Stress Relief, Normalizing, Spheroidize Anneal, Annealing, Bright Annealing, Normalized, Quenched and Tempered, Solution Annealing, etc ;

4) Continuous stenciling as required ;

5) Rust prevention treatment and light oiled as required ;

6) Plastic plugs or caps on both ends as required ;

7) Packing Type: Round , Square, Rectangle, Hexagon. Streamline, etc.

8) Packaging: Hexagonal bundles of max. 1,500kg with several steel strips, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips or packed in heavy tri-wall boxes, wooden boxes, wooden slats as requires.

9) Main Applications: Automobile and Bearing Industry, Mechanical and Structral Purpose, Hydraulic and Petrochemical Purpose, etc.

 
Mobile: +86 138 128 775 59 -->Terry(Chief Business Executive Officer)
Email:  tubesolution at sina. com
F a x: +86 512 584 390 33

 

 Commercial Information:
  1) Delivery                    :  Within 35 days ;
  2) Min Order                 :  5 Tons;
  3) Packing way              :  As per our export standard for shipment ;
  4) Term of payment       :  30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C ;
  5) Delivery Port              :  Shanghai Port ;
  6) Offer Validity              :  5-7 Days        ;
  7) Container                   :  20' or 40', etc ;
  8) Manufacture methods  :  Cold Worked Method.



  Packaging Bundle,wooden,etc
  Delivery lead time 40day
  Minimum order 5T
  Supply ability 4500T/M

Inquire now